Went from a 2-man crew struggling with post holes to 1 guy with a hydraulic auger in 6 months, the difference is wild.
Our old hand digger had us spending 45 minutes per hole on this rocky clay soil outside Austin, but after renting a Toro auger last spring we cut that to under 10 minutes each, has anyone else made the switch and never looked back?