My old boss in Spokane had us set posts with a 4-inch gravel base, but I switched to 6 inches last year.
We had a whole row of cedar panels lean after a wet winter, and the inspector said our drainage was too shallow. Now I pack that extra gravel and haven't had a single call back. Anyone else make that change after a specific job?