Saw a weird door gap at the new library downtown
Working on the public library job in Springfield, noticed the elevator doors had a 3/8 inch gap on the top floor. Turns out the building is settling more than they planned. Anyone dealt with a similar gap issue in a new build?
3 comments
Log in to join the discussion
Log In3 Comments
reesepatel1mo ago
Gotta love when the building starts doing its own thing before the paint is even dry. Sounds like the architect's plans and the ground had a little disagreement. Maybe they can just call it a design feature for extra ventilation.
5
jordanl821mo ago
Check the soil report first, @reesepatel.
2
leo_park211mo ago
Read about a new condo building over on Elm that had the same problem. Doors started sticking and gaps showed up around the windows after the first year. They had to bring in a structural engineer to check the foundation. Makes you wonder what the soil report said before they started digging.