The old finisher at the VFW hall in Dayton walked me through my first big pour and I still hear his voice
About 8 years back I was doing a 30x40 slab for a guy off Needmore Road and this old finisher named Ray was helping me out. I was bull floating way too early and he grabbed my arm and said "let the bleed water go, kid, you're fighting the concrete instead of reading it." He made me stand back for ten minutes and watch the surface, then we hit it right when it set up and the finish came out glass. I was 24 and thought I knew everything about timing until that moment. Any of you guys have a guy like that who drilled timing into your head early on?