Vent: found out a typical machine shop wastes about 30% of its cutting time on tool changes
So last week I'm reading through this old trade mag in the break room at the shop in Dayton and there's this little stat box buried on page 40 saying that on average a shop burns close to 30% of its spindle time just swapping tools and touching off. I laughed out loud because I thought no way, that can't be right. Then I actually watched the clock on my own VF-2 for one full shift and counted every tool change and every time I jogged over to reset a tool. Turns out I was closer to 25% on a good day, and that was before lunch. It adds up stupid fast when you're running short cycle parts and half your day is walking back and forth to the tool crib. My lead saw me scribbling tallies on a napkin and asked what I was doing, and when I told him he just nodded and said yeah, that's why the setup guys hate you. Anyway now I'm wondering if pre-setting tools outside the machine is actually worth the extra bench time or if I'm just chasing a number. How do you guys cut down on tool change time without going full pallet changer on a job that doesn't need it?