Serious question, the old hand at the shop in Dayton told me to always run the first part slow and check every dimension, but my lead says balls to the wall | CNC Operators - nhfree.com
Serious question, the old hand at the shop in Dayton told me to always run the first part slow and check every dimension, but my lead says balls to the wall
So here is the setup. I got hired on at a job shop in Dayton about 8 months ago and the old guy training me, Carl, had 30 years in. He pulled me aside the first week and said pull back the feed and speed about 20 percent on the first part of every run so you can catch a bad setup before you scrap the stock. I did it his way for months and sure enough I caught a wrong work offset on a $400 block of aluminum that would have been garbage. But now Carl retired and my new lead keeps getting on me about cycle time, saying the machine is rated for the faster numbers and I'm babying it. Part of me thinks Carl was right because I literally watched it save a part, and part of me thinks the lead is right because we are here to make money. The debate in my head is whether slow and careful on part one actually saves money in the long run or if it is just old habits. What do the rest of you do on a first run, and has anyone had a lead push speed on you like this?
A $400 block of aluminum and your lead wants to gamble on it to save a few minutes? That's wild to me. Carl's 20 percent pullback literally paid for itself in one catch, and cycle time math never seems to count the scrap.