Chose tack strip over glue down on a concrete slab in Tulsa, warning for anyone tempted to skip the strip
Last month a homeowner in Tulsa wanted to save money so I picked glue down over tack strip in her finished basement, and I'm regretting it now that the carpet has started lifting at two of the seams near the floor drain. I should have used a 20 oz stretch with strip and a proper pad even with the extra labor cost of about $220 on that job. Has anyone else dealt with a slab that stays damp in one corner and how did you get the carpet to hold without pulling it all back up?