Shoutout to the guy in Tulsa who caught my mortar mix mistake
Helped a buddy lay a small garden wall outside Tulsa last weekend and almost mixed my sand and lime by feel like always. Guy working next door walked over and asked what ratio I was running. Told him 1 part cement to 3 sand, no lime. He laughed and pointed at the bags, said the lime is what keeps it workable in this heat and I'd be fighting it all afternoon. Sure enough his mix spread like butter and mine set up stiff in the wheelbarrow within 20 minutes. What ratio do you all keep for small jobs in the summer?