Guy in Cicero told me to pull my keypad wire 6 inches past the hole and I've done it every job since
Was doing a panel swap at a two-flat on 31st about a year ago. Old timer who owned the place was watching me fish wire for a new keypad in the hall and he says, why are you cutting it flush at the box? I told him it looks cleaner. He laughed and said the next guy who opens that wall will cuss your name. Said to leave a loop of slack coiled behind the drywall. Two weeks ago I come back to that same building for an add-on and the drywall guy had nicked a sensor wire during a patch job. Having that extra slack meant I spliced it in 10 minutes instead of cutting open a whole section. So now I leave a loop every time even when the homeowner gripes about it. Anyone got a rule like that they picked up from an old-timer on a job?